RESTORATION LOGISTICS

 

SERVICES

© 2008 Restoration Logistics

Fremont Peak Park,

Friends of Fremont Peak Park, Seattle, WA

Restoration projects in this region often have a steep slope component. Our staff is comfortable working on steep grades and are equipped and experienced with the use of safety harnesses and rigging.  Techniques we use include:

Slope Stabilization and Erosion Control

  1. Live-staking

  2. Erosion control fabric installation

  3. Terracing with coir logs

Contracting

Consulting

  1. Willow fascines and wattles

  2. Revegetation strategies

  3. Other technical soil bioengineering solutions